This posting has been archived
#596095
•
Posted 8/3/2021
Hutchinson Valley Trunk Sewer Rehabilitation, Eastchester, NY
- Owner Reference
- 18-514
- Bid Date
- Sep 1, 2021 at 11:00am
- Pre-Bid
- Mandatory - 8/10/2021 @ 10:00am @ (for location please or )
- Estimate
- $850,000 - $900,000
- Owner
- County of Westchester NY
Description
The work under this contract consists of providing all necessary labor, material and equipment required to rehabilitate the Hutchinson Valley Trunk Sewer including but not limited to bypassing of sanitary flows around the work area excavation; jack and bore a 30-inch steel pipe casing under exit 18W on the Hutchinson Parkway South; installation of a 16-inch DIP gravity sewer within the pipe casing; and trenching in the Exit 18W median to connect to the existing manhole. Bonds and prevailing wages
Contact
- John Coelho
- (914) 995-5144
- [email protected]
CBS ID: 596095 | Published 8/3/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.