This posting has been archived
#596350
•
Posted 8/4/2021
Lake House Waste Lines, Shoreline, WA
- Bid Date
- Aug 25, 2021 at 01:00PM
- Pre-Bid
- Mandatory - 8/11/2021 @ 11:00AM @ (for location please or )
- Owner
- County of King Housing Authority (KCHA), WA
Description
The Lake House Waste Lines project is comprised of (but not limited to) providing a Cured in Place Pipe (CIPP) structural liner or a Spin Cast Pipe (SIPP) coating to the existing waste piping system. The main waste lines run under the building’s concrete slab. The size of the cast iron pipe ranges from 4” and 6”. Contractor’s base bid will include reaming the 4” and 6” waste line piping removing burrs, roots, scale, and dirt on the inside of all pipes within the drawing scope. Bid to include any necessary concrete patching, wall repair or landscape restoration where work was performed. Install a total of five, 4” double sweep cleanouts. Bonds Required. Prevailing Wages.
Contact
- Amy Kurtz
- (206) 574-1283
- [email protected]
CBS ID: 596350 | Published 8/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.