This posting has been archived
#596414
•
Posted 8/5/2021
Silverado Trail Phase L Paving, Napa CA
- Owner Reference
- RDS 20-04 Fed STPL 5921(083)
- Bid Date
- Aug 26, 2021 at 11:30am
- Pre-Bid
- Mandatory - 8/18/2021 @ 05:00PM @ (for location please or )
- Estimate
- $14 Million
- Owner
- County Of Napa
Description
The proposed project will consist of the placement of a 2.0 inch thick layer of rubberized asphalt, gap graded (RHMA-G) on Silverado Trail from Hardman Ave intersection to Oak Knoll Ave intersection, including conform and floodway grinding and related work. The restriping pattern will be to match existing, or per plan. Bonds and Prevailing Wages. This is a Federal Aid Project and DBE goal is 16%. All questions must be mailed, faxed or e-mailed to Sonja El-Wakil ([email protected]), Napa County Public Works, 1195 Third St. Room 101, Napa, CA 94559, Fax # 707-299-4283 by August 18, 2021, 5:00 P.M. No questions will be accepted after this deadline.
Contact
- Sonja El-Wakil
- (707) 253-4351
- [email protected]
CBS ID: 596414 | Published 8/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.