Water and Sewer Utility Relocation at the SR79 Gila River Bridge, Florence, AZ
- Owner Reference
- 21-WU92
- Bid Date
- Sep 1, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/25/2021 @ 10:00am @ (for location please or )
- Owner
- Town of Florence, AZ
Description
The project requires that approximately 1,800 feet of water and sewer lines be relocated. ADOT has developed a utility corridor adjacent to the new bridge construction that will assure that all utilities will no longer present a conflict for them. This project will install
water and sewer lines by horizontal boring while pulling the requisite pipe through the borehole then connecting the systems back to existing. The material to be bored through is an amalgam of soils and stream like material that must be traversed while maintaining pipe alignment within the specifications. Service contract period effective October 18, 2021 and ending October, 18, 2022. Deadline for questions is August 26, 2021 by 3:00pm. Bonds and prevailing wages
Contact
- Susan Jonas
- (520) 868-7500
- [email protected]
CBS ID: 596450 | Published 8/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.