Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#596450 Posted 8/5/2021

Water and Sewer Utility Relocation at the SR79 Gila River Bridge, Florence, AZ

Owner Reference
21-WU92
Bid Date
Sep 1, 2021 at 02:00pm
Pre-Bid
Mandatory - 8/25/2021 @ 10:00am @ (for location please or )
Owner
Town of Florence, AZ

Description

The project requires that approximately 1,800 feet of water and sewer lines be relocated. ADOT has developed a utility corridor adjacent to the new bridge construction that will assure that all utilities will no longer present a conflict for them. This project will install water and sewer lines by horizontal boring while pulling the requisite pipe through the borehole then connecting the systems back to existing. The material to be bored through is an amalgam of soils and stream like material that must be traversed while maintaining pipe alignment within the specifications. Service contract period effective October 18, 2021 and ending October, 18, 2022. Deadline for questions is August 26, 2021 by 3:00pm. Bonds and prevailing wages

Contact

CBS ID: 596450 | Published 8/5/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.