Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#596487 Posted 8/5/2021

Misc Econ Dev-Confluence Village Garage, Columbus, OH

Owner Reference
RFQ019484, 440105-100001
Bid Date
Sep 2, 2021 at 01:00pm
Pre-Bid
Scheduled - 8/17/2021 @ 02:00pm @ (for location please or )
Owner
City of Columbus OH

Description

The City of Columbus, Department of Public Service is receiving bids for the Misc Econ Dev - Confluence Village Garage project. Bids are to be submitted only at www.bidexpress.com. This project involves the construction of a new parking garage in the Astor Park area, located off Columbus Crew Way, opposite the new Lower.com Field. The parking garage will include 677 spaces and will serve residents, workers, and visitors to the Astor Park area. There will be two entrances with a total of 5 lanes for entry and exit, located at the northeast and southwest corners. The garage will be five (5) stories with three (3) parking bays and center bay ramping. The garage will include openings for direct connection to the adjacent residential buildings, constructed under a separate contract. Garage utilities will include underground stormwater detention, electrical for lighting and electric vehicle charging, and a sanitary service. Fire protection will include a remote Fire Department Connection, located along the north side of the proposed Cahill Drive. Construction will include concrete crash walls, perforated metal exterior, tension mesh exterior, and glass vertical circulator with dual elevators in the southeast corner, and other such work as may be necessary to complete the contract. This project also includes construction of a new public roadway, Cahill Drive. Cahill Drive will be located approximately 225’ north of Nationwide Boulevard between Neiland Drive on the west and Columbus Crew Way on the east. Cahill Drive will be a 26’ wide brick paver roadway with concrete sidewalk on the north and south sides. The roadway will include new storm sewer and electric distribution to include a vault and duct banks for service to the adjacent developments and other such work as may be necessary to complete the contract. Bonds, insurance & prevailing wages apply

Contact

  • Jennifer Gallagher
  • (614) 645-8376

CBS ID: 596487 | Published 8/5/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.