This posting has been archived
#596514
ā¢
Posted 8/5/2021
Parallel Sanitary Interceptor Phases C & D, Dayton, OH
- Bid Date
- Aug 26, 2021 at 12:00pm
- Pre-Bid
- Mandatory - 8/10/2021 @ 11:00am @ (for location please or )
- Owner
- City of Dayton OH
Description
This project consists of the construction of a water main relocation and construction of an interceptor sewer parallel to the existing interceptor sewer along the West side of the Great Miami River from Longworth Siphon (near Albany St) to Deeds Point Junction Chamber (near Riverside Dr). Approximately 11,350 linear feet of 6-foot high by 8-foot wide box culvert with āVā channel and 1,420 linear feet of 36-inch PCCP watermain will be installed via open cut. Project completion date 08/31/2024.
Contact
- Kenny Roy
- (937) 333-1374
- (937) 333-6768
- [email protected]
CBS ID: 596514 | Published 8/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.