This posting has been archived
#596643
•
Posted 8/6/2021
Main Street Interchange Improvement Project, Lake Elsinore, CA
- Owner Reference
- CIP No. Z10017 / Caltrans Permit No. 08-19-A-OP-0691
- Bid Date
- Sep 9, 2021 at 02:00pm
- Estimate
- $5,270,916
- Owner
- City of Lake Elsinore, CA
Description
In general, this project consists of widening to install a traffic signals at the intersection of I-15 at southbound ramps, northbound ramps, and Camino Del Norte, in the City of Lake Elsinore. The work involves construction of hot mix asphalt pavement, rubberized hot mix asphalt pavement, grading, retaining walls [Type 1 (Case 2) (Modified), Type 7B (Modified), and Sub Horizontal Ground Anchor)], drainage inlets, corrugated metal pipe, reinforced concrete pipe, curb, sidewalk, access ramps, modification of exiting irrigation system and planting, modification of lighting, traffic signal mast arms and foundations, ramp meters, temporary water pollution control, roadway signs, pavement delineation and any other work as may be required. Project duration is 300 working days. Questions are due by Aug 12th @ 3:00 PM. Bonds required. Prevailing wages apply.
Contact
- Nicole McCalmont (x245)
- (951) 674-3124
- [email protected]
CBS ID: 596643 | Published 8/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.