This posting has been archived
#596850
•
Posted 8/10/2021
Construction of Oldsmar Trail Phase 6 from Stevens Ave to Race Track Rd, Oldsmar, FL
- Owner Reference
- 2021-002-0-2021
- Bid Date
- Aug 24, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 7/22/2021 @ 10:00am @ (for location please or )
- Owner
- City of Oldsmar
Description
The contractor will furnish all labor, materials, equipment, hardware, and incidentals to complete the Work to construction the Douglas Trail Phase 6. The project will provide a multimodal pedestrian and cycling trail from Race Track Road to Stevens Road on the northern portion of the Douglas Road Right of way. The project will be to construct an 8 to 10-foot-wide trail. The trail will be asphalt pavement with concrete header curbs. In order to construct this trail, stormwater piping will be installed with storm structures and filling-in of existing ditches. The project will require watermain relocation by Horizontal Directional Drill. Bonds Required. Prevailing Wages.
Contact
- Katie Farrelly
- (813) 749-1268
CBS ID: 596850 | Published 8/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.