This posting has been archived
#596854
•
Posted 8/10/2021
Fruit Farm Creek Restoration Culvert Installation Project, Marco Island, FL
- Owner Reference
- 2021-019-0-2021
- Bid Date
- Sep 16, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/19/2021 @ 10:00am @ (for location please or )
- Owner
- City of Marco Island FL
Description
The Restoration of Mangroves at Fruit Farm Creek Project will consist of the installation of four (4) sixty-inch (60”) culvert pipes under the San Marco Road. The installation will include dewatering, excavation, pipe installation with flowable fill backfill, concrete headwalls and pavement restoration. Maintenance of Traffic will be required for the project on a 24/7 basis. Bonds Required. Prevailing Wages.
Contact
- Lina Upham
- (239) 389-5011
- [email protected]
CBS ID: 596854 | Published 8/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.