This posting has been archived
#596930
•
Posted 8/10/2021
Marshfield High School North Stadium Re-Roof/Video Booth Remodel, Coos Bay, OR
- Bid Date
- Aug 19, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/12/2021 @ 01:00PM @ (for location please or )
- Owner
- Coos Bay School District, OR
Description
The Work on this contract consists of the removal and replacement of the existing built-up roof system on the MHS North Stadium Building. Work to include removal of the existing built-up system down to the existing plywood decking. Removal of damaged plywood and 2x6 tongue & groove decking will also be required as needed. Reroofing to include furnishing and installing a single-ply membrane roofing system complete with associated flashings. Roof area is approximately 13,150 sq. ft. Alternates include replacement of stadium lighting and construction of a video booth. Bonds Required. Prevailing Wages.
Contact
- Architect
- (541) 269-1166
- [email protected]
CBS ID: 596930 | Published 8/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.