This posting has been archived
#596956
•
Posted 8/10/2021
Chatham Road Overlay - Lelend Grove, IL
- Owner Reference
- 22CHR008
- Bid Date
- Sep 2, 2021 at 02:00pm
- Owner
- City of Springfield, IL
Description
Typical work shall consist of curb and gutter removal and replacement, bituminous surface removal, concrete patching, cleaning and priming the existing pavement and placing leveling binder and surface course, bituminous full-depth patching, curb ramp and sidewalk removal and replacement together with the necessary adjustments and incidental construction. Total distance of 4383 feet to be improved. Bond required.
Contact
- Amanda Long
- (217) 789-2191
- [email protected]
CBS ID: 596956 | Published 8/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.