Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#596990 Posted 8/11/2021

Henry J. Mills Electrical Upgrades, Stage 2, Riverside, CA

Owner Reference
1990
Bid Date
Sep 15, 2021 at 02:00pm
Pre-Bid
Mandatory - 8/17/2021 @ 01:00pm @ (for location please or )
Estimate
$7,600,000 to $9,200,000
Owner
Metropolitan Water District of Southern CA at Los Angeles

Description

The work consists of adding supporting infrastructure for an incoming 12kV service, upgrading plant’s 4,160V main switchgear and standby generator switchgear; replacing existing emergency generator control panels and generator PLC, installing new electrical conduits, ductbanks and manholes; expanding switchgear building; and various other electrical improvements; and performing other appurtenant work as specified and shown on the drawings. Bonds required. Prevailing wages apply. DVBE participation at least 25 percent. Term is 770 days.

Contact

CBS ID: 596990 | Published 8/11/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.