This posting has been archived
#596990
•
Posted 8/11/2021
Henry J. Mills Electrical Upgrades, Stage 2, Riverside, CA
- Owner Reference
- 1990
- Bid Date
- Sep 15, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/17/2021 @ 01:00pm @ (for location please or )
- Estimate
- $7,600,000 to $9,200,000
- Owner
- Metropolitan Water District of Southern CA at Los Angeles
Description
The work consists of adding supporting infrastructure for an incoming 12kV service, upgrading plant’s 4,160V main switchgear and standby generator switchgear; replacing existing emergency generator control panels and generator PLC, installing new electrical conduits, ductbanks and manholes; expanding switchgear building; and various other electrical improvements; and performing other appurtenant work as specified and shown on the drawings. Bonds required. Prevailing wages apply. DVBE participation at least 25 percent. Term is 770 days.
Contact
- Specs Desk
- (213) 217-6515
- [email protected]
CBS ID: 596990 | Published 8/11/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.