Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#597085 Posted 8/11/2021

Sugar Maple Way Road Construction, Kingsland, GA

Owner Reference
COK 21-034
Bid Date
Sep 7, 2021 at 02:00pm
Owner
City of Kingsland GA

Description

Scope of work: Remove existing asphalt by milling or other mechanical methods from Woodbridge Rd, 1130 feet east to marks near the driveway of 121 Sugar Maple Way. (full road width plus tapers at Woodbridge), regrade existing lime rock base to a 1 percent crown and fill any rutting, compact base material to 98 percent, repave with 1 ½” of 9.5 hot mix asphalt, mix and prime/tack coat application are to be completed to GDOT standards, reinstall stop bar at Woodbridge using thermoplastic and reflective beads. Temporary markings to be applied. All technical questions regarding the Scope of Work in this request shall be directed to: Bill Coleman, Public Works Director PH: (912) 552-4020 Email: [email protected]. Bond required.

Contact

CBS ID: 597085 | Published 8/11/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.