Redwood Road 2021 Improvements, Taylorsville UT
- Bid Date
- Aug 16, 2021 at 03:00PM
- Pre-Bid
- Encouraged - 8/9/2021 @ 03:00PM @ (for location please or )
- Owner
- Taylorsville-Bennion Improvement District
Description
The Project consists of constructing water and sewer improvements as follows: • (4) lengths of directional drilling installations of 6 and 8-inch diameter HDPE drinking water pipeline 100 linear feet each. • 450 linear feet of 6, 8, and 12-inch drinking water pipelines. • (2) 50 linear feet lengths of 18-inch sewer pipeline.
• (3) new sewer manholes. • Associated sewer by-pass pumping. • Miscellaneous water meters and service laterals. Bonds required. The Work will be substantially complete on or before November 30, 2021. All items requiring placement of asphalt in UDOT Right-of-Way shall be complete by October 15, 2021. UDOT indicated to the Engineer for this project, each day the low temperature is above 40 degrees asphalt paving work may continue.
Contact
- Tyler Allen
- (801) 566-5599
- [email protected]
CBS ID: 597196 | Published 8/12/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.