Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#597203 Posted 8/12/2021

124th Ave NE - NE 12th St to NE Spring Blvd, Bellevue, WA

Owner Reference
21000
Bid Date
Sep 2, 2021 at 10:00AM
Estimate
$7,900,000-$8,400,000
Owner
City of Bellevue, WA

Description

Work contemplated to be performed under this contract is as follows: Removal of Structures and Obstructions Cement Concrete Curb and Gutter. Cement Concrete Sidewalk. Asphalt Concrete Pavement. Asphalt for Bike Lane. Cement Concrete Pavement. Water Main Improvements. Fire Department Connections. Storm Drainage Improvements. Illumination. Traffic Signals Systems. Landscaping. Urban Design Elements. Retaining Walls. Fencing. Joint Utility Trench. Property Restoration and Miscellaneous Work. DBE goal of 19% Bonds Required. Prevailing Wages.

Contact

CBS ID: 597203 | Published 8/12/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.