Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#597332 Posted 8/13/2021

Southside Interceptor CIPP Sewer Rehabilitation Phase 2, Vancouver, WA

Owner Reference
21-27
Bid Date
Aug 31, 2021 at 11:00AM
Owner
City of Vancouver WA

Description

The Contractor shall furnish and install approximately 2,794 lineal feet of 36-inch of Cured-In- Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultraviolet (UV) cured CIPP. This work will also include customer notification, bypass pumping, cleaning, root and sediment removal, initial Closed Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection. Work will also consist of epoxy or polyurethane lining of 9 manholes for corrosion prevention in conjunction with the proposed CIPP lining. Bonds Required. Prevailing Wages.

Contact

CBS ID: 597332 | Published 8/13/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.