This posting has been archived
#597418
•
Posted 8/13/2021
Joseph Jensen WTP Ozone Power Supply Units Replacement, Granada Hills, CA
- Owner Reference
- 2001
- Bid Date
- Sep 23, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/25/2021 @ 09:00am @ (for location please or )
- Estimate
- $1,000,000 - $1,400,000
- Owner
- Metropolitan Water District of Southern CA at Los Angeles
Description
The work consists of removal of five ozone generator power supply units (PSU) and installation of four Metropolitan-furnished PSUs; removal, modification, and installation of associated electrical power distribution and control system, instrumentation and control equipment, cooling water pipes, high voltage cables, PLC, OIT, and communication modules; demolition of an existing PSU chiller and piping; repurposing of an existing PSU chiller into a back-up HVAC chiller; and other appurtenant work as specified and shown on the drawings. Bonds required. Prevailing wages apply. Term is 440 days.
Contact
- Specs Desk
- (213) 217-6515
- [email protected]
CBS ID: 597418 | Published 8/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.