Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#597501 Posted 8/15/2021

Security Gate Physical Enhancements at B St. Cruise Terminal, San Diego, CA

Owner Reference
2020-09R
Bid Date
Sep 15, 2021 at 02:00pm
Pre-Bid
Strongly Encouraged - 8/17/2021 @ 02:00pm @ (for location please or )
Estimate
$110,786
Owner
Port of San Diego CA

Description

The Work Includes: 1. Furnish all labor, materials, supplies, and equipment as necessary to complete the construction of the Security Enhancements at B Street Cruise Terminal, San Diego, California. 2. The work shall include, but is not limited to, the following as shown on the Plans and described in these Specifications. a. Removing all existing hydraulic bollard system components unless otherwise directed and as shown on the project drawings. b. Removing all existing non-essential electrical components associated with existing hydraulic bollard system including existing UPS. c. Installing Hydraulic Power Unit (HPU) and hydraulic line infrastructure pathway between HPU and barriers at the main public entrance to the B Street Cruise Terminal as shown on project drawings. d. Installing all cabling, power supply components and other associated or required devices, or any hardware or software license required to integrate all new, or replacement equipment and infrastructure at the B Street Cruise Terminal. e. Equipment warranties and maintenance per specifications. f. Testing and project commissioning per specifications. g. Securing and paying for permits, governmental fees, licenses, engineering drawings and calculations necessary to construct and complete the project as indicated on these Plans and Specifications. h. Procuring and installing traffic loop detector kit as shown on the project drawings and per manufacturer’s recommendations. i. Procuring and installing HPU enclosure as shown on the project drawings and per manufacturer’s recommendations. j. Removing, shipping to Delta Scientific Corporation (DSC) for refurbishing, and re-installing bollards which meet or exceed project performance specifications and as shown on the project drawings. k. Installing and maintaining traffic rated cover plates where existing in-ground equipment or infrastructure is removed in order to provide fully operational access to the B Street Cruise Terminal. Partial Federal Funding. Bonds required. Prevailing wages apply. DBE goals.

Contact

CBS ID: 597501 | Published 8/15/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.