This posting has been archived
#597534
•
Posted 8/15/2021
Skyline Water Tank Replacement, Millbrae, CA
- Owner Reference
- 670-102
- Bid Date
- Sep 2, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/17/2021 @ 10:00am @ (for location please or )
- Owner
- City Of Millbrae
Description
Removal of an existing 1 million gallon welded steel tank and a 0.5 million gallon welded steel tank. Construction of a 1.5 million gallon prestressed concrete tank, and construction of a new inlet/outlet pipe and all other related work described in the Drawings and Specifications. Bonds required. Prevailing wages apply.
Contact
- Andrew Yang
- (650) 259-2393
- [email protected]
CBS ID: 597534 | Published 8/15/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.