Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#597570 Posted 8/16/2021

Gooseberry Point Wastewater Treatment Plant Improvements, Bellingham, WA

Bid Date
Sep 14, 2021 at 10:00AM
Pre-Bid
Scheduled - 8/25/2021 @ 10:00am @ (for location please or )
Estimate
$13,000,000-$14,500,000
Owner
Lummi Tribal Sewer and Water District

Description

The project will construct improvements to the existing wastewater treatment plant to increase the plant capacity to a maximum month flow of 557,000 gallons per day. The project includes construction of a new headworks facility, two new primary clarifiers, one new secondary clarifier, two new aerobic digesters and associated sludge handling and thickening equipment, one new plant drain pump station, one new effluent pump station, a new primary clarifier pump building, and a new operations building. The project also includes modifications to the existing rotating biological contactors, modifications to the existing process tanks to convert them to contact and stabilization basins, modifications to the existing equipment building including replacement of the existing equipment, modifications to the existing two secondary clarifiers with new clarifier mechanisms, modifications to the existing ultraviolet disinfection system, modifications of existing abandoned chlorine contact tank to a non-potable water wet well and an effluent wet well. Bond Required. Prevailing Wages.

Contact

CBS ID: 597570 | Published 8/16/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.