This posting has been archived
#597948
•
Posted 8/18/2021
Sonoma State University Copeland Creek Streambank Repair, Rohnert Park, CA
- Owner Reference
- 30303798
- Bid Date
- Aug 27, 2021 at 12:00pm
- Owner
- Cal. State Sonoma CSUSN Sonoma State University
Description
Work within the project area includes excavation and reconstructing the southern bank of Copeland Creek adjacent to the existing site improvements. The work will include the use of bio-restoration processes that incorporates hardscape features such as large rocks along with planting and erosion control measures. The area of rock
placement will encompass approximately 48 square feet of the southern bank and be located below the ordinary high water mark. Total excavated area is estimated to be 180 square feet (0.004 acres), approximately 15 feet in width and 12 feet in depth. The
work will include a cut of a maximum of 20 cubic yards and net fill of 20 cubic yards of materials that includes 9 cubic yards of engineered fill and 11 cubic yards of rock. The work is anticipated to be conducted over a period of approximately 30 days. Bonds required. Prevailing wages apply.
Contact
- Carolyn Faulconer
- (707) 664-3830
- [email protected]
CBS ID: 597948 | Published 8/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.