This posting has been archived
#597952
•
Posted 8/18/2021
Fort Howard Sewage Pumping Station Improvements, Fort Howard, MD
- Owner Reference
- 20175 SX0
- Bid Date
- Oct 14, 2021 at 10:30am
- Pre-Bid
- Scheduled - 8/25/2021 @ 09:00am @ (for location please or )
- Owner
- County of Baltimore MD
Description
The work under this Contract includes, but is not limited to, demolition, bypass pumping, earthwork, utilities, fencing, paving, cast-in-place and precast concrete, masonry, metal fabrications, fiberglass products, roofing, painting, dry-pit submersible sewage pumps, sump pump, flowmeter, cranes and hoists, pipe, valves and fittings, sluice gate, plumbing, heating and ventilation equipment, electrical switchgear and transformers, electrical service and distribution, lighting, instrumentation and control, variable frequency drives, generator and automatic transfer switch, and all other work required to complete the sewage pumping station improvements. The work also includes all specified, indicated and shown mechanical and electrical equipment, appliances, appurtenances, furnishings, instrumentation and controls, accessories, tests and sundry parts and material as shall be necessary and required for a completely operable installation satisfactory to the Engineer. MBE documentation required. Q&A due by 5pm, 9/17/21. Bonds required. Prevailing wages apply.
Contact
- Barb Wentworth
- (410) 887-3531
- [email protected]
CBS ID: 597952 | Published 8/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.