This posting has been archived
#598074
•
Posted 8/19/2021
Above Ground Diesel Storage Tank - Remove & Replace, Fredericksburg, VA
- Owner Reference
- QQ-EVA001_QQ239374-V3
- Bid Date
- Sep 17, 2021 at 11:00am
- Owner
- City of Fredericksburg, VA
Description
Remove the existing 6000-gallon double-wall diesel storage tank used to run the wastewater treatment plant as a backup power generator. Provide new above-ground double-wall diesel storage take, 6000 gallons. Supply all labor, parts, delivery, and materials, applicable permits. Include new service lines to and from the day-use tan (approx. 30 feet). Include removing the existing diesel fuel (approximately 5500 gallons), filtering, and replacing the fuel into the new tank. Call or email the City of Fredericksburg Assistant Director of Public Works – Utilities, Milas Smith, with any further questions. [email protected] 540-310-8214
Contact
- Milas Smith
- (540) 310-8214
- [email protected]
CBS ID: 598074 | Published 8/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.