This posting has been archived
#598420
•
Posted 8/23/2021
LBCC Main Campus Takena Hall Remodel Project, Albany, OR
- Owner Reference
- B21-01
- Bid Date
- Sep 23, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 8/26/2021 @ 09:30AM @ (for location please or )
- Owner
- Linn-Benton Community College (LBCC), OR
Description
Renovations: Architectural design calls for a complete remodel of the interior space of
the Student Success and First Resource Centers on the East side of the
Takena Hall corridor. Numerous office spaces to be relocated and
functional, open space to be established and updated with updated
lighting, flooring, and paint. Electrical and other utilities to be moved as
needed. Information Technology to be performed by College. Multiple
working departments including, but not limited to, Financial Aid, Advising,
and Registration will be impacted by changes to the work space.
Contractor will need to coordinate with these departments during
construction to minimize the time they are to be relocated and the impact
on their departments.
2. Upgrade to Existing HVAC Systems
Upgrade all existing HVAC system components and controls in
accordance with mechanical drawings. Procure, install, and test all related
and required equipment. Contractor to replace ceiling grid, ceiling tile, and
light fixtures associated with the ceiling mechanical work.Bonds Required. Prevailing Wages.
Contact
- Jess Jacobs
- (541) 917-4332
- (541) 917-4314
- [email protected]
CBS ID: 598420 | Published 8/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.