Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#598420 Posted 8/23/2021

LBCC Main Campus Takena Hall Remodel Project, Albany, OR

Owner Reference
B21-01
Bid Date
Sep 23, 2021 at 02:00pm
Pre-Bid
Mandatory - 8/26/2021 @ 09:30AM @ (for location please or )
Owner
Linn-Benton Community College (LBCC), OR

Description

Renovations: Architectural design calls for a complete remodel of the interior space of the Student Success and First Resource Centers on the East side of the Takena Hall corridor. Numerous office spaces to be relocated and functional, open space to be established and updated with updated lighting, flooring, and paint. Electrical and other utilities to be moved as needed. Information Technology to be performed by College. Multiple working departments including, but not limited to, Financial Aid, Advising, and Registration will be impacted by changes to the work space. Contractor will need to coordinate with these departments during construction to minimize the time they are to be relocated and the impact on their departments. 2. Upgrade to Existing HVAC Systems Upgrade all existing HVAC system components and controls in accordance with mechanical drawings. Procure, install, and test all related and required equipment. Contractor to replace ceiling grid, ceiling tile, and light fixtures associated with the ceiling mechanical work.Bonds Required. Prevailing Wages.

Contact

CBS ID: 598420 | Published 8/23/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.