Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#598442 Posted 8/23/2021

Terminal 5 North Reefer Infrastructure, Seattle, WA

Owner Reference
MC-0320465
Bid Date
Sep 21, 2021 at 05:00PM
Pre-Bid
Scheduled - 8/31/2021 @ 12:00PM @ (for location please or )
Estimate
$6,600,000-$13,200,000
Owner
Port of Seattle WA

Description

This project will install Electrical Distribution System to power 1000 Refrigerated Container outlets rated at 3Phase, 30A, 480V each. This requires installing (2) Medium Voltage Sectionalized Cabinets, (4) Enclosed 2500-KVA Secondary Unit Substations and (4) Low Voltage Power Factor Correction Capacitors. This equipment will be connected to T5 Primary Substation utilizing electrical infrastructure installed under T5 Modernization project and additional new electrical infrastructure which include (1200 ft) Medium Voltage Duct-bank, Electrical Manholes, Medium Voltage Feeder Cables, and all necessary support structures. Bonds Required. Prevailing Wages.

Contact

CBS ID: 598442 | Published 8/23/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.