This posting has been archived
#598650
•
Posted 8/24/2021
Reconstruct the existing Illinois Prairie Path to HMA asphalt bike path, Kane County, IL
- Owner Reference
- 060-61H17
- Bid Date
- Sep 17, 2021 at 02:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
The work consists of widening the existing 8-foot-wide aggregate path to construct a 10-foot-wide hot-mix asphalt bicycle path with 2-foot earth shoulders and minor realignments. The work will include HMA bike path, aggregate base courses, existing path removal, tree removal, placement of embankments, drainage, curb and gutter, detectable warnings, signing, solar equipment, restoration, and all incidental and collateral work necessary to complete the project as shown on plans and as described herein. Prevailing wages. EEO requirements. DBE goal is 20 percent.
Contact
- Mark Windsor
- (217) 785-1669
- [email protected]
CBS ID: 598650 | Published 8/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.