This posting has been archived
#598659
•
Posted 8/24/2021
Replace the bridge carrying CH 2 over Coal Creek, Fulton County, IL
- Owner Reference
- 068-89795
- Bid Date
- Sep 17, 2021 at 02:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
This work shall consist of the removal of the existing bridge and construction of a three span steel W-beam superstructure with reinforced concrete deck on concrete integral abutments and concrete wall piers, 170’-0” back to back of abutments and 30’-0” out to out of deck, skewed 25 Rt. ahead. Also included are channel excavation and protection, erosion control measures, seeding, reconstruction of an additional ~205’ of County Highway 2 with an HMA surface, and other related work. This project is located approximately 4.25 miles south of London Mills, Illinois. Prevailing wages. EEO requirements. DBE goal is 3 percent.
Contact
- Mark Windsor
- (217) 785-1669
- [email protected]
CBS ID: 598659 | Published 8/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.