Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#598665 Posted 8/24/2021

Construction of a shared-use path along IL 157, Madison County, IL

Owner Reference
072-97762
Bid Date
Sep 17, 2021 at 02:00pm
Owner
State of Illinois Department of Transportation (ILDOT) IL

Description

The proposed shared use path construction project is located adjacent to IL 157 (FAP Route 592. The project limits are from the southwest quadrant of the intersection with Lewis Road to the Goshen Trail pedestrian tunnel under IL 157. The project length is 3,048 feet (0.577 miles). The work on this project consists of removals, earthwork, aggregate base, PCC sidewalk, concrete curb and gutter, driveway pavement, culverts, storm sewer and drainage structures, retaining walls, ornamental railing, traffic signal modifications, pavement markings, traffic signs, seeding and all incidental and collateral work necessary to complete the work in the above-described Section according to the plans, specifications and special provisions. Prevailing wages. EEO requirements. DBE goal is 20 percent.

Contact

CBS ID: 598665 | Published 8/24/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.