This posting has been archived
#598827
•
Posted 8/25/2021
Northeast Community Complex Soccer Fields roadway extension, parking lot, restroom bldg, fields sub-grade, Dalton, GA
- Bid Date
- Sep 21, 2021 at 02:00pm
- Owner
- City of Dalton GA
Description
The project consists of roadway extension of Hale Bowen Drive, parking lot, restroom concessions building, and 2 soccer fields to sub-grade. Standards and specifications consist of mass grading, laser grading, utilities, asphalt paving, detention and drainage, concrete, fencing and associated electrical. This project is Phase 1 of a 2-Phase project. Shaw Sports Turf has been awarded the Synthetic Turf portion of the project (Phase 2 to include from sub-grade up on the Sports field only) and the awarded General Contractor
for Phase 1 will need to coordinate for Phase 2 (Shaw Sports) for mobilization and installation of Synthetic Turf field when sub-grade and field perimeter sidewalk has been installed. Access to field to coordinated with Shaw Sports Turf. Bonds required.
Contact
- Megan Elliott
- (706) 278-9500
- [email protected]
CBS ID: 598827 | Published 8/25/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.