Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#598872 Posted 8/25/2021

P. Rickman Extension & Associated Turn Lane Project (grading, curb & gutter, concrete sidewalk, paving & striping), Holly Springs, GA

Owner Reference
2016-04
Bid Date
Sep 14, 2021 at 10:00am
Owner
City of Holly Springs GA

Description

The approximate extent and character of the work is generally described as follows: Location 1 – Right Turn Lane on Holly Springs Parkway @ Hickory Road, Location 2 – Right Turn Lane on Hickory Road @ Holly Springs Parkway, Location 3 – Right Turn Lane on Holly Springs Parkway @ P. Rickman Industrial Drive Ext., Location 4 – Extension of P. Rickman Industrial Drive. All Locations include but are not limited to grading, curb & gutter, concrete sidewalk with brick paver accents, base & paving, and striping. Bonds required.

Contact

CBS ID: 598872 | Published 8/25/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.