#599089 Posted 8/27/2021

Turtle Creek No. 3 Primary Pump Station Project, San Antonio TX

Owner Reference
CO-00404-SM
Bid Date
Sep 29, 2021 at 10:00am
Pre-Bid
Recommended - 9/10/2021 @ 10:00am @ (for location please or )
Estimate
$30,684,046
Owner
San Antonio Water System (SAWS), Contracting Office, TX

Description

Construction of a 12.5-million gallon per day (MGD) firm capacity outdoor high-service pump station consisting of four (4) 4.167-MGD vertical turbine pumping units, two (2) 10-MGD well pumps and piping, piping modifications to an existing 3-MGD well, 5-MG pre-stressed concrete ground storage tank, on-site sodium hypochlorite generation (OSG) system and fluoride treatment system facilities, electrical and controls building, chemical building, fluoride building, impressed current cathodic protection system, and other miscellaneous items such as fencing, site paving, drainage improvements, and site security for the Turtle Creek No. 3 Primary Pump Station Project, SAWS Job. No. 21-6001.

Contact

CBS ID: 599089 | Published 8/27/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.