This posting has been archived
#599089
•
Posted 8/27/2021
Turtle Creek No. 3 Primary Pump Station Project, San Antonio TX
- Owner Reference
- CO-00404-SM
- Bid Date
- Sep 29, 2021 at 10:00am
- Pre-Bid
- Recommended - 9/10/2021 @ 10:00am @ (for location please or )
- Estimate
- $30,684,046
- Owner
- San Antonio Water System (SAWS), Contracting Office, TX
Description
Construction of a 12.5-million gallon per day (MGD) firm capacity outdoor high-service pump station consisting of four (4) 4.167-MGD vertical turbine pumping units, two (2) 10-MGD well pumps and piping, piping modifications to an existing 3-MGD well, 5-MG pre-stressed concrete ground storage tank, on-site sodium hypochlorite generation (OSG) system and fluoride treatment system facilities, electrical and controls building, chemical building, fluoride building, impressed current cathodic protection system, and other miscellaneous items such as fencing, site paving, drainage improvements, and site security for the Turtle Creek No. 3 Primary Pump Station Project, SAWS Job. No. 21-6001.
Contact
- (210) 233-2335
- (210) 233-4409
- [email protected]
CBS ID: 599089 | Published 8/27/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.