This posting has been archived
#599377
•
Posted 8/30/2021
Freedom Rd Upgrade, SR 2004, New Sewickley, PA
- Owner Reference
- 67016
- Bid Date
- Sep 30, 2021 at 11:00am
- Estimate
- $20m-$24.99m
- Owner
- State of Pennsylvania Department of Transportation PA (PADOT or PENNDOT))
Description
The relocation of SR 2004 (Freedom Road), construction of a box culvert and relocating a tributary to Crows Run, replacement of a box culvert carrying Wolf Run, construction of a roundabout at the intersection of SR 989 and Freedom Road, paving, signing, pavement markings, guiderail, highway lighting and other miscellaneous construction all within a length of 11,915.00 Linear Feet (2.257 Miles) as shown on the approved drawings included in the Bid Package for SR 2004, Section B06. in Beaver County, New Sewickley Township. This project being situated as follows: SR 2004 - B06 - From the intersection of SR 2004 and T-606 (Park Quarry Road) at Segment 0060 Offset 0247 (Sta. 93+75.00) to approximately 900 feet east of the intersection of SR 2004 and SR 989 at segment 0090 offset 1197 (Sta. 204+00). SR 989 - B14 - from a point approximately 500 feet south of the intersection with SR 2004 at Segment 0200, Offset 0077 (390+75) Sta. to a point approximately 650 feet north of the intersection with SR 2004 at Segment 00200, Offset 1202 (Sta. 402+00.00). DBE goal 10%. Prequalification required. Prevailing wages apply.
Contact
- ECMS
- (855) 783-8330
CBS ID: 599377 | Published 8/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.