This posting has been archived
#599542
•
Posted 8/31/2021
Deep Forest Lane Drainage Connection Project, Fayetteville, GA
- Owner Reference
- WS432-01
- Bid Date
- Sep 23, 2021 at 02:00pm
- Owner
- City of Fayetteville GA
Description
The Project includes removing and replacing an existing 18-inch CMP cross drain pipe at 140 Deep Forest Lane (across Oak St) with a new 18-inch RCP cross drain connection pipe at the end of Deep Forest Lane, and constructing a new drainage inlet. The project also includes earth work, pavement patching, implementing/maintaining erosion control, and establishing permanent vegetation. Questions of a technical nature should be submitted in writing to design engineer, Mr. Jason L. Walls, P.E. at Integrated Science & Engineering via e-mail: [email protected]. The final date for any questions or clarifications should be no later than Friday, September 10, 2021. Contact Ms. Carleetha Talmadge at 770-719-4161 or [email protected] to be approved as a bidder.
Contact
- Carleetha Talmadge
- (770) 719-4161
- [email protected]
CBS ID: 599542 | Published 8/31/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.