This posting has been archived
#599560
•
Posted 8/31/2021
US-US 42-01.89 Four Lane Resurfacing, Village of Westfield Center, OH
- Owner Reference
- 210531
- Bid Date
- Nov 18, 2021 at 02:00pm
- Owner
- State of Ohio Department of Transportation OH (OHDOT)
- Trades
- General Engineering Contractor GEC
Description
DBE Goal: 8.0% For improving various sections per plans & specs by planing off 3.25" of existing asphalt concrete pavement, performing a large amount of partial depth asphalt & full depth removal & rigid replacement repairs, resurfacing with 1.75" thick lift of 19mm intermediate asphalt concrete course and a 1.50" thick lift of 12.5mm asphalt concrete surface course along US Rtes 42 & 224 from just before Congress Rd (SLM 1.89 US 42) to just east of Lake Rd (SLM 15.61 US 224), including all related items of work. Project includes minor to moderate structure repairs on 13 structures along the route. Completion date 11/15/2022 Bonds, insurance & prevailing wages apply.
Contact
- Dave Slatzer
- (614) 466-3598
CBS ID: 599560 | Published 8/31/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.