This posting has been archived
#599858
•
Posted 9/4/2021
Multiple Sewershed Package 15 (Railroad), San Antonio TX
- Owner Reference
- CO-00400-FG Job No. 19-4508
- Bid Date
- Sep 27, 2021 at 11:00am
- Pre-Bid
- Recommended - 9/14/2021 @ 10:00am @ (for location please or )
- Estimate
- 3,444,000
- Owner
- San Antonio Water System (SAWS), Contracting Office, TX
Description
Construction of approximately 1,326 linear feet (LF) of 8-inch open cut sewer main, 735 LF of 10-inch open cut sewer main, 25 LF of 12-inch open cut sewer main, 447 LF of 15-inch open cut sewer main, 72 LF of 24-inch open cut sewer main, 900 LF of 21-inch pipe-burst sewer main, 1,356 LF of 10-inch cured-in-place pipe (CIPP), 538 LF of 12-inch cured-in-place pipe, 213 LF of 21-inch cured-in-place pipe, 1,251 LF of 24-inch cured-in-place pipe, and 100 LF of 42-inch jacking or boring, within, crossing, or adjacent to Union Pacific Railroad right-of-way for the Multiple Sewershed Package 15 (Railroad) Project. The SMWVB goal on this project is 20%
Contact
- Florinda Gonzales
- (210) 233-3341
- (210) 233-4290
- [email protected]
CBS ID: 599858 | Published 9/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.