Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#599861 Posted 9/4/2021

Birch Street Bridge Replacement Project, Montrose, CO

Owner Reference
21-027
Bid Date
Sep 22, 2021 at 02:00pm
Pre-Bid
Mandatory - 9/7/2021 @ 02:00PM @ (for location please or )
Owner
City Of Montrose, CO

Description

The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Birch Street Bridge Replacement Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Perform removals to clear the site for construction including, but not limited to, asphalt pavement, the existing bridge, bridge abutments (including pile cutoff if encountered), guardrails, and signage. B. Construct a temporary access drive around the work area in order to maintain access throughout construction. C. Support existing natural gas and communication utilities where passing through the bridge area and its open excavation. D. Replace an existing sanitary sewer main beneath and adjacent to the new bridge. This replacement will follow the same alignment and will require bypass pumping of sewer flows throughout construction. This line conveys sewer flows from approximately 30 single family residences (<250 gpm). E. Replace and upsize an existing asbestos cement waterline beneath and adjacent to the new bridge. This will follow the same general alignment of the existing line and will require temporary bypass and frost protection of the temporary line throughout construction. F. Construct a new pre-fabricated aluminum box culvert and associated headwalls, wingwalls, and foundation. This includes, but is not limited to, excavation, subgrade prep, foundation prep, and backfill as necessary for construction. G. Install empty fiber optic conduits with hand-hole vaults across the project area. H. Reconstruct the roadway base and pave with hot mix asphalt. I. Remove and replace road signage. J. Implement stormwater management, traffic control, water management, site security, site restoration, and quality control testing as required to complete the work in accordance with the plans and specifications. Bonding and Insurance.

Contact

CBS ID: 599861 | Published 9/4/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.