This posting has been archived
#599901
•
Posted 9/4/2021
Clayton Road Traffic Operation Improvements Phase 1, Concord, CA
- Owner Reference
- 22-11
- Bid Date
- Oct 7, 2021 at 02:00pm
- Estimate
- $383,000
- Owner
- City Of Concord CA
Description
The work to be done consists of, mobilization; traffic control and construction signage; installation of fiber optic communications cable in conduit, conduits, pull boxes, fiberoptic splicing and testing, fiber optic switches, fiber optic small form pluggable modules, fiber pig tails, and other such items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed. Questions are due no later than 4:00 PM on Sept 27th. The City encourages the use of DBE subcontractors, however, there will not be
any requirements for this project. Bonds required. Prevailing wages apply.
Contact
- Ali Hatefi, P.E.
- (925) 671-3284
- [email protected]
CBS ID: 599901 | Published 9/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.