This posting has been archived
#599912
•
Posted 9/5/2021
*WITHDRAWN* Water Main Replacement - Holden St. and Clinton St., Shrewsbury, MA
- Bid Date
- Sep 16, 2021 at 11:00am
- Owner
- Town of Shrewsbury, MA
Description
Installation of approximately 4,500 linear feet of 12-inch CLDI Class 52 pipe, 1,300 linear feet of 8-inch CLDI class 52 pipe, 600 linear feet of 6-inch CLDI class 52 pipe and all associated appurtenances. Approximately (22) 1” PE lateral service reconnections, 30 main reconnections and 22 new hydrants. Prequalification with MassDOT is required. MBE goal is 5% and WBE goal is 5%. Bonds and prevailing wages
Contact
- Andy Truman
- (508) 841-8502
- [email protected]
CBS ID: 599912 | Published 9/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.