This posting has been archived
#599935
•
Posted 9/5/2021
Highway Garage Repair, Halfmoon, NY
- Owner Reference
- HWYGARAGE-1
- Bid Date
- Sep 15, 2021 at 01:00pm
- Owner
- Town of Halfmoon NY
Description
The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the necessary repairs to fix the damage to the garage described in these Specifications including, but not necessarily limited to, the following: Removal of electrical supply to overhead door operator, overhead door springs & upper door tracks, and upper door panel and door operator. Remove and replace approximately 450 sq. ft. of exterior wall system. Remove and replace approximately 50 linear feet of interior and exterior panel closure polyethylene foam. Remove and reset approximately 24 linear feet of gable and rake trim. Remove and reset approximately 32 linear feet of overhead door jamb trim cap. Remove and replace approximately 140 linear feet of wall perlins. Remove and replace approximately 270 sq. ft. of 4" batt insulation. Replace electrical to overhead door operator and 20' x 16' overhead door with struts, track, hardware, and springs. Bonds and prevailing wages
Contact
- Paul Maiello x2532
- (518) 717-7410
- [email protected]
CBS ID: 599935 | Published 9/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.