Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#600021 Posted 9/6/2021

Paw Paw Wastewater Treatment Plant Headworks & Miscellaneous Clarifier Improvements, Denison, TX

Owner Reference
0443-034-01
Bid Date
Oct 6, 2021 at 02:00pm
Pre-Bid
Scheduled - 9/22/2021 @ 02:00PM @ (for location please or )
Owner
City of Denison TX

Description

The Work includes, but is not necessarily limited to, modifications or additions to the following existing facilities: a. Repair Duck Creek Surge Control Box concrete walls and related appurtenances at the headworks. The CONTRACTOR shall provide diversion pumping upstream of and flow isolation downstream of the Duck Creek Surge Control Box repairs for the entire duration of the repairs. b. Construction of a new above-grade, concrete secondary clarifier splitter box and related pumps, piping and appurtenances. c. Conversion of Primary Clarifier No. 2 into Secondary Clarifier No. 3 and related piping d. Construction of a new return activated sludge pump station and related pumps, piping, and appurtenances. e. Inspection and cleaning of existing 20/HWE/DIP line from Headworks to Primary Clarifier No.1 and associated earthwork and pipe modifications required to gain access for inspection and cleaning. 2. Testing of all systems to ensure performance in accordance with manufacturer’s design and as specified herein; perform necessary adjustment as required, reporting proper functioning to ENGINEER; and all required plant start-up services in accordance with Section 01 75 25 “Equipment Testing and Start-up”. 3. Unless otherwise specified, Contractor shall provide the following: a. Temporary facilities and controls as specified in Section 01 50 00 “Temporary Facilities and Controls”. b. Provide quality control, material testing, field-testing, and related services in accordance with Section 01 40 00 “Quality Requirements”. c. Provide training of OWNER’S operation and maintenance personnel in accordance with Section 01 79 00 “Demonstration and Training”. d. Field surveying required for support of construction operations. e. Applicable permits, licenses and jurisdictional inspections, certificate of occupancy, and related work as necessary for Owner to assume operation of facility. Questions due by Sept 29th via email to Mike Kuykendall, P.E. Bonds required. Prevailing wages apply.

Contact

CBS ID: 600021 | Published 9/6/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.