This posting has been archived
#600036
•
Posted 9/6/2021
RE-BID - North Main Ave & Soledad St Reconstruction, San Antonio, TX
- Owner Reference
- 23-01598
- Bid Date
- Oct 5, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 9/13/2021 @ 01:00PM @ (for location please or )
- Estimate
- $8,008,856.63
- Owner
- City of San Antonio TX
Description
Contract will provide for the reconstruction of N. Main Avenue and Soledad Street from Pecan Street to Navarro Street including the construction of pedestrian illumination, landscaping and irrigation, storm sewer upgrades, traffic signal upgrades and pedestrian amenities and enhancements as appropriate and with available funding. Joint-bid utilities include upgrades to CPS gas and SAWS water and sewer. The N. Main Avenue & Soledad Street (Pecan Street to Navarro Street) is a continuation of the previous 2012 bond funded project that resulted in the conversion of N. Main Avenue and Soledad Street to two-way operation and made various street and sidewalk improvements along these two corridors between Commerce Street and Pecan Street. Bonds required. Prevailing wages apply.
Contact
- Lona Carter
- (210) 207-8774
- (210) 207-4034
- [email protected]
CBS ID: 600036 | Published 9/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.