This posting has been archived
#600040
•
Posted 9/6/2021
Admissions Building Foundation Stabilization, Denton, TX
- Owner Reference
- RFP-731-21-021-CJ
- Bid Date
- Oct 7, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 9/10/2021 @ 01:00PM @ (for location please or )
- Owner
- Texas Woman's University, TX
Description
The Administration Building was constructed in 1954 with an addition added in 1969. Both structures sit on deep foundations with the original construction sitting on belled piers and the newer construction sitting on straight shaft piers embedded in rock. Over time, the original construction foundation is moving down relative to the rest of the building and new addition. This request is design of a micropile solution to support the building and arrest any future downward movement. This micropile solution can be seen in the drawings. This solution will be a deferred design and
will need to be accomplished by accessing the crawlspace of the original building from the
exterior with all of the work being performed from the inside of the crawlspace. Access to the occupied floor of the original building and all floors of the addition will not be permitted and shall not be relied on for the purpose of this project. Questions are due by 5:00 PM on Sept 17th. Bonds required. Prevailing wages apply. HSP required.
Contact
- Chelle Jezek
- (940) 898-3541
- [email protected]
CBS ID: 600040 | Published 9/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.