This posting has been archived
#600192
•
Posted 9/7/2021
Permanent Wastewater Flow Monitoring Project, East Longmeadow, MA
- Bid Date
- Sep 22, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 9/8/2021 @ 10:00am @ (for location please or )
- Owner
- Town of East Longmeadow, MA
Description
The work consists of installing a 12-inch Parshall Flume and precast concrete vault, electrical conduit, approximately 130 linear feet of new gravity sewers, 2 precast concrete manholes, and 4 precast concrete doghouse manholes. The work will also include the associated sanitary sewer service reconnections, pavement repair, surface restoration, control and power conduits and wiring, temporary bypass pumping, and appurtenant work. Bonds and prevailing wages
Contact
- David Partridge
- (413) 572-3267
- [email protected]
CBS ID: 600192 | Published 9/7/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.