Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#600236 • Posted 9/7/2021

Stormwater Detention Basin & Conveyance Improvements (Ph 3 Zube), Hockley, TX

Owner Reference
21-0240
Bid Date
Sep 20, 2021 at 02:00pm
Pre-Bid
Recommended - 9/8/2021 @ 02:00PM @ (for location please or )
Owner
County of Harris Tx

Description

Major work activities for Phase III include excavation of approximately 436,835 cubic yards of material to be hauled off-site and excavation of 65,420 cubic yards of material for on-site fill for the creation of the high bank of berm, placement along the proposed geomorphic channel as topsoil, and topsoil stockpile. Improvements also involve construction of Natural Stabilized Channel Design items. These items include, but are not limited to, construction of the geomorphic (aka bankfull) channel, riffles, pools, log vanes, boulder vanes, and boulder drop structure. Contractor shall include company and individual’s name and experience of NSCD construction. Experience and NSCD construction activities shall be reviewed and subject to approval by HydroGeo Designs, whom designed the NSCD features. See attached for additional detailed requirements. Questions are due no later than 12:00 PM on Sept 10th. Bonds required. Prevailing wages apply. DBE GFE at a minimum.

Contact

CBS ID: 600236 | Published 9/7/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.