This posting has been archived
#600366
•
Posted 9/8/2021
Rosewood Wash Drainage Improvement Project, Reno, NV
- Owner Reference
- USD-2022-01
- Bid Date
- Sep 30, 2021 at 02:00pm
- Estimate
- $1,350,000
- Owner
- City Of Reno Nevada
Description
Installation of new storm drain infrastructure including PVC pipe, RCP pipe, manholes, catch basins, and appurtenances on Watt Street and Bonnie Briar Place between Plumb Lane and Lakeside Drive. Also included is replacement of sanitary sewer main, laterals, and installation of a sanitary sewer drop manhole, including potable water main installation and gas infrastructure adjustments. Asphalt patching and portland cement concrete curb and gutter/pedestrian ramp replacement. Project duration is 110 Calendar Days. Questions due by 5:00 PM on Sept 23rd. Bonds required. Prevailing wages apply.
Contact
- Steve Gamilis
- (775) 334-2461
- [email protected]
CBS ID: 600366 | Published 9/8/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.