This posting has been archived
#600397
•
Posted 9/9/2021
114 Martin Luther King Senior Heritage Trail Renovation, Stockbridge, GA
- Owner Reference
- 2021-0011
- Bid Date
- Oct 28, 2021 at 03:00pm
- Pre-Bid
- Scheduled - 9/23/2021 @ 10:00am @ (for location please or )
- Owner
- City of Stockbridge GA
Description
The project consists of the renovation of the Ted Strickland Community Center, located at 114 MLK Martin Luther King Senior Heritage Trail Renovation, Stockbridge, Georgia 30281. The project consists of demolition & limited renovation of the tenant building, located at 114 MLK Senior Heritage Trail, Stockbridge, Georgia 30281. The final deliverable will be a “warm white box” tenant space, that consists of the following work. The removal of all existing internal walls, replacing existing storefront walls, infill of the existing exterior walls with new doors. Repair work to the roof, including a new roof membrane, replacement of HVAC, removal of existing lighting & ceiling w/ new lighting for the common room. Repair work to the floor, capping of plumbing, removal & limited replacement of electrical equipment. Removal of other miscellaneous items, and repairs to return the building to
functionality. Bonds required.
Contact
- Lindell Miller
- (678) 833-3322
- (770) 389-7912
- [email protected]
CBS ID: 600397 | Published 9/9/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.