Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#600438 Posted 9/9/2021

Harbor Bay Isle Lagoon Improvements Project, Alameda, CA

Owner Reference
No. P.W. 07-21-28
Bid Date
Oct 7, 2021 at 02:30pm
Estimate
$250,000
Owner
City of Alameda, Public Works, CA

Description

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the Harbor Bay Isle Lagoon stormwater control system including all demolition work including handling and legal disposal of lead containing materials, structural concrete repair and new concrete work, coating of concrete surfaces, new chain link fencing, new galvanized grating, installation of a new owner-furnished gate actuator, new level control instruments, installation of owner-furnished electrical enclosures and controls, all electrical improvements, testing, site restoration, temporary controls, and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer. This Project is situated in the following City facility locations on Bay Farm Island:  Lagoon 1 North Outlet (San Leandro Channel)  Lagoon 1 Safeway Monitoring Station (Safeway Plaza)  Lagoon 1 South Inlet (Shoreline Park). Work to be completed within 60 working days. Bonds required. Prevailing wages apply.

Contact

CBS ID: 600438 | Published 9/9/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.