This posting has been archived
#600527
•
Posted 9/10/2021
Resurface various routes. St. Charles & Warren Counties, MO
- Owner Reference
- 211015-B02
- Bid Date
- Oct 15, 2021 at 02:00pm
- Estimate
- $1M - $2.5M
- Owner
- State of Missouri Department of Transportation MO (MODOT)
Description
The proposed work, hereinafter called the work, includes: (1): Job J2S3208 Route TT St. Charles, Warren County. Resurface from Route 94 near Dutzow to Route T in St. Charles County, the total length of improvement being 3.54 miles. (2): Job J2S3239 Route A Lincoln, Warren County. Resurface from Route DD to I-70 near Pendleton in Warren County, the total length of improvement being 12.922 miles. (3): Job J2S3240 Route U Lincoln County. Resurface on Route 47 to Route J South Junction near Troy, the total length of improvement being 8.877 miles. Bonds required. Prevailing wages apply.
Contact
- Design Division - Central Office
- (573) 751-2876
CBS ID: 600527 | Published 9/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.