This posting has been archived
#600559
•
Posted 9/10/2021
A & B Gates Moving Walkway Removal, McCarran Airport, Las Vegas, NV
- Owner Reference
- 3023
- Bid Date
- Sep 29, 2021 at 01:30pm
- Pre-Bid
- Scheduled - 8/24/2021 @ 10:00am @ (for location please or )
- Owner
- McCarran International Airport, General Aviation Airport NV
Description
This project will remove the 2 moving walkways each in the A concourse and the B concourse. New Terrazzo flooring will be added in the place of the demolished moving walkways. Electrical infrastructure for future retail carts will be added in the new terrazzo pathways. A new corridor for exiting will be added in the A concourse. Questions are to be in writing only. Use Attachment D for pre-bid questions or email the Contracts Dept. Bonds required. Prevailing wages apply.
Contact
- Contracts
- (702) 261-4697
- (702) 261-5050
- [email protected]
CBS ID: 600559 | Published 9/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.