This posting has been archived
#600773
•
Posted 9/13/2021
Winters Chapel Road Multi-Use Trail, Phase I, Dunwoody, GA
- Owner Reference
- 21-03
- Bid Date
- Oct 12, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 9/24/2021 @ 01:00pm @ (for location please or )
- Owner
- City of Dunwoody GA
Description
The Winters Chapel Road Multi-Use Trail, Phase I project work includes adding a 12-foot wide concrete path along the west side of Winters Chapel Road from Charmant Place north to Dunwoody Club drive. Additional shoulder improvements include a closed drainage network, curb and gutter, grading, sidewalk on the east side, and a re-aligned intersection at Dunwoody Club Drive and Winters Chapel Road. The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications as directed and the terms of this contract including all incidentals as directed by the City of Dunwoody Director of Public Works or his representative. Bonds required.
Contact
- John Gates
- (678) 382-6700
- [email protected]
CBS ID: 600773 | Published 9/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.